ZSL1100S

Andere video's
September 11, 2025
Brief: Discover the ZSL1100S Crawler Water Well Drilling Rig, capable of reaching depths up to 1100M with a powerful 22000Nm torque. Ideal for water wells, rescue operations, mining, and exploration, this rig offers high efficiency, reliability, and ease of operation. Manufactured by Zhengyuan Drilling and Mining, a leader in perforation equipment since 2005.
Related Product Features:
  • Max drilling depth of 1100 meters for deep well applications.
  • Powerful 22000Nm torque for efficient drilling in tough conditions.
  • Drilling diameter range of 105-800mm to suit various project needs.
  • High drilling efficiency with speeds of 10-35 meters per hour.
  • Compact dimensions (7.7×2.25×3m) for easy transport and setup.
  • Equipped with a Weichai 220kw engine for reliable performance.
  • 55T lifting force for handling heavy drilling components.
  • Customizable configurations to meet specific project requirements.
Vraagstukken:
  • What is the lead time for ordering the ZSL1100S rig?
    Standard models are delivered in 10-15 days, while customized models take 20-35 days.
  • Does Zhengyuan provide after-sales support?
    Yes, we offer dedicated after-sales service, including technical guidance and on-site training by engineers.
  • Can the ZSL1100S be customized for specific needs?
    Absolutely, we provide tailored attachments and configurations to meet unique project requirements.
  • Is Zhengyuan a manufacturer or a trading company?
    We are a professional manufacturer specializing in crawler-type and vehicle-mounted drilling rigs, with a global reputation.
Gerelateerde video's

SL600S

De Installatie van de de Putboring van het kruippakjewater
October 07, 2025

FSL500

Geologisch boorplatform
May 27, 2025

330 Meter Crawler Boorgat Hydraulisch Crawler Type Water Well Drilling Rig te koop

De Installatie van de de Putboring van het kruippakjewater
May 26, 2025

SL600

De Installatie van de de Putboring van het kruippakjewater
May 27, 2025

SL500S

De Installatie van de de Putboring van het kruippakjewater
May 27, 2025

SL400S

De Installatie van de de Putboring van het kruippakjewater
June 16, 2025

Shandong Zhengyuan Parameters van SL3305 rupsband waterput boorinstallatie

De Installatie van de de Putboring van het kruippakjewater
July 22, 2025

Shandong Zhengyaun Parameters van SL3305 kruipboorinstallatie

De Installatie van de de Putboring van het kruippakjewater
July 22, 2025

SL750

De Installatie van de de Putboring van het kruippakjewater
May 27, 2025

SL1000

De Installatie van de de Putboring van het kruippakjewater
May 27, 2025