Good price  online

products details

Home > Products >
Crawler Water Well Drilling Rig
>
Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment

Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment

Brand Name: ZHENGYUAN
Model Number: SL400S
MOQ: 1 set
Price: $35000-$45000
Payment Terms: tt
Supply Ability: 25 sets / month
Detail Information
Place of Origin:
CHINA
Certification:
ISO/CE
Type:
500S
Warranty:
1 Year,12 Months,One Year
Weight:
10.6T
Usage:
Water Well,Or OTHER MINE
Power Type:
Diesel,Electric
Dimension(l*w*h):
6.52*1.85*2.51m
Condition:
New
Certification:
ISO9001,ISO,ENERGY SAVING,CE,ASME
Voltage:
Diesel Engine Driven,220V/380V,NO,380V,Customized
Product Name:
500m Water Well Drilling Rig Machine
Power(w):
110KW
Drilling Depth:
100m/200m/300m/400m,500m
Drilling Diameter:
105-400mm
Engine:
CUMMINS,YUCHAI STOCK
Packaging Details:
WOODEN CASE OR OTHER
Supply Ability:
25 sets / month
Highlight:

Hydraulic Crawler Water Well Drilling Rig

,

Construction Crawler Water Well Drilling Rig

,

Fully Hydraulic Down Hole Drilling Equipment

Product Description

Product Description

Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment 0

1. Overview

SL500S This drilling rig is equipped with a hydraulic system for lifting the drilling frame, picking up and unloading the drill pipe, rotating and feeding, outriggers, winches, walking, etc. it can be used to work directly with 6-metre drill pipe or 6-metre casing, which greatly reduces the labour intensity and improves the construction efficiency and quality of the project. Each type of drilling rig can be converted into vehicle chassis.

It can drill holes in different strata (rock layers, mud layers, sand layers) with a maximum diameter of up to 500mm. The unique convex block design and centralized control operating system are easy to maintain and operate. This machine adopts excavator track chassis, with high off-road performance, and can also be installed on trucks for stronger maneuverability.

The Zhengyuan series crawler drilling rig can use mud drilling in soft formations and air down the hole hammer to drill various formations in rock drilling. The down the hole hammer is used for rock drilling, and the slag is discharged through air pressure

500C Crawler mounted water well drilling rig

Max drilling depth

500m

Drilling diameter

105-400mm

Drill pipe length

6m

Air pressure

1.2-3.5Mpa

Air consumption

16-55m³/min

Drill pipe diameter

89/102mm

Axial pressure

6 t

Lifting force

30 t

Fast feeding speed

48m/min

Fast lifting speed

29m/min

Max rotary torque

11000/5500Nm

Max rotary speed

75/150r/min

Small auxilianry winch lifting force

1.5t

Jacks stroke

1.6m

Drilling efficiency

10-35

Moving speed

3 km/h

Uphill angle

21º

Weight

10.6 t

Dimension

6.52*1.85*2.51m

Engine

YUCHAI STOCK 110KW

 

Dealing with complex geological formations

By strengthening the drill bit and optimizing the drilling strategy, we can effectively overcome hard rock formations, maintain drilling speed, reduce equipment wear, and extend service life.

Drilling in soft soil formations

For soft soil formations, specially designed drilling tools and parameters are used to reduce drilling resistance, improve drilling efficiency, and avoid hole collapse.

Drilling techniques for sand layers

In sand layer drilling, a special mud formula and circulation system are used to prevent sand layer collapse, maintain wellbore stability, and improve drilling success rate.

Multi layer continuous operation

The drilling rig has excellent geological adaptability and can operate continuously between different geological layers without frequent replacement of drilling tools, improving the continuity and efficiency of operations.

Dual hydraulic power head

Drilling speed is faster, more durable, and can be adjusted to high and low speeds.

High-power generator

Provide sufficient power, equipped with larger radiators and air filters, as well as the ability to use an external mud pump

Centralized operation console

The layout is centralized and clear, making it easy to operate.

Application scenarios of positioning function

Multi well layout positioning: In the multi well layout, the 500m water well drilling rig can accurately and quickly locate each well position, improve construction efficiency, and reduce labor costs.

Directional drilling positioning requirements: Meet the directional drilling positioning requirements under complex geological conditions, achieve precise drilling trajectory control through accurate positioning, and improve drilling success rate.

Advantages of complex terrain positioning: In complex terrain, drilling rigs can overcome terrain limitations, achieve high-precision positioning, and provide strong support for water well construction.

Collaborative positioning with other equipment: It can achieve collaborative positioning with other construction equipment, improve overall construction efficiency, and ensure the coordination and safety of the construction process.

Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment 1

 

 

SL500S WTAER DRILL RIG DETAILS

Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment 2

Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment 3

 

WHO ARE WE?

 Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment 4

Fully Hydraulic Crawler Water Well Drilling Rig Construction Down Hole Drilling Equipment 5

FAQ:

1. Are you a trading company or a manufacturer?

We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.

 

2. How can we guarantee quality?

Always a pre-production sample before mass production;always final inspection is done before shipment;and our main unit has a one-year warranty, during which all damaged accessories can be replaced with new ones. We provide machine installation and operation videos.

 

3. How to inspect the goods?

1) Support customers to come to the factory for on-site inspection.

2) Support customers to designate third-party companies to inspect goods.

3) Support video inspection.

 

4. Do you have after-sales service?

Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.

 

5. How about quality assurance?

We provide a one-year quality guarantee for the main machine of the machine.