The construction area this time is located in southern Kazakhstan, where the geological conditions are complex, with high rock hardness and multiple fractured structures. This poses severe challenges to the stability, drilling efficiency and precise control capabilities of the drilling rig. Equipped with an intelligent hydraulic drive system and adaptive drilling technology, the Shandong Zhengyuan SL600S drilling rig demonstrated strong performance during construction: it not only achieved an efficient drilling speed of [X] meters per hour, which is nearly 30% higher than that of local traditional equipment, but also accurately avoided fractured zones through real-time pressure monitoring and automatic speed regulation functions, ensuring the integrity of the well structure.